Tour 

 

 

The Twisted Cow as it looked prior to construction.

 

Below all the walls have been removed.  Ceiling tiles have been taken down in preparation for the new duct work and tin ceiling.

Plumbing trenches for all the new

under ground plumbing required.

Back to Tour Main Page